- This topic has 0 replies, 1 voice, and was last updated 4 years, 10 months ago by .
Viewing 1 post (of 1 total)
Viewing 1 post (of 1 total)
- You must be logged in to reply to this topic.
Submitted by Ben Kalish
https://bugs.launchpad.net/evergreen/+bug/1858220
It would be really handy to have a configurable automated status update for materials that don’t arrive at their destination by an amount of time selected with an org unit setting.
In plainer language:
Library A puts an item in transit to Library B. If Library B does not receive the item within a selected timeframe, say, 3 weeks, then the item is automatically marked as Lost in Transit.
This would help a lot with reporting, particularly on the fiscal side of materials that go into transit ne’er to be seen again.